Desing and construction of automation

 

Design and construction of automation

  • Automation of transports lines Body Shop, Primer, Paint Shop and Trim (1995, GM Truck Assembly Plant, Silao, Gto.)
  • Automation of softener and demineralize water plant 1995, (Intema-BDF México, México, DF.)
  • Automation of wastewater Plant (1996, Intema – Farmacéuticos Lakeside de México, Atlacomulco, Edomex.)
  • Automation of oiled water Plant (1996, Chrysler Assembly Plant, Saltillo, Coah.)
  • Automation of chemical additives recovery plant (1996, Adhesivos CONVIL, Puebla, Pue.)
  • Automation of Electrical generation plant PH Zimapan, (1996,  CFE  Zimapan, Hgo.)
  • Temperature monitoring system for precision cutting machines (1998, Faurecia Duroplast Puebla.)
  • Automation of softener and demineralize water plant (1999, Bristol Myers Squibb, México, DF)
  • Automation of Mixing plant for shampoo and hair color products (2001, Bristol Myers Squibb, México, D.F.)
  • Design of control system for 3-way valves for powder slush machines (2002, Faurecia Duroplast, Puebla.)
  • Electrical and mechanical Design of row material transport for floor tiles production. (2006, LAMOSA Revestimientos, Tlaxcala.)
  • Control system for water supplying in Mining Plant (2007, Zimapan, Hgo.)
  • Control system for material transport and handling in Mining Plant (2007, Zimapan, Hgo.)
  • Design and construction of assembly station of Foam Block + Pal Nut in back door of PT 2008 (2007, Faurecia Duroplast, Puebla.)
  • Design of IR test station for cavities detection of foaming in instrument panel of VW Bora/A4 (2007, Faurecia Duroplast, Puebla.)
  • Design of IR test station for cavities detection of foaming in instrument panel of VW Jetta A6 (2010, IACNA, Toluca, EdoMex)