Installation, assembly and modernization of industrial machinery.

 

Installation, assembly and modernization of industrial machinery.

  • Improve of performance of twin tempering furnaces. Decrease cycle time in 42%. (1997, Krupp Metalúrgica de México, planta Puebla, Pue.)
  • Assembly and automation of six 1500T mechanical presses and robot feeding (1998, Autotek Industrial de México, Puebla, Pue.)
  • Mechanical upgrade and automation of NB instru-ment panel assembly trans-port line (1998, Faurecia Duroplast Puebla. )
  • Assembly and automation of two 1000T mechanical presses (1998, Autotek Industrial de México, Puebla.)
  • Assembly and automation of two 1000T mechanical presses (1998-99 PEMSA, Celaya, Gto.)
  • Design and construction of 50 electronic and control laboratories for technical schools, (2000, SEP Mexico.)
  • Installation of mechanical presses and welding machines (2000, Van Holdings de México, S.A. Querétaro)
  • Installation of machinery for door coating and assembly, Reanault Clío assembly line (2001, Faurecia Duroplast Puebla.)
  • Upgrade for hair color packaging  products (2002, Bristol Myers Squibb, México, D.F. )
  • Design pokayoke system (2002, Faurecia Duroplast, Puebla.)
  • Installation of SMART PAC controller for 250T press (2003, Flex & Gate Lunkomex, Puebla.)
  • Design and construction of two packaging machines for reinforced mesh (2003, DEACERO planta Puebla.)
  • Addition of tenth coating station in the turntable system (2003, Faurecia Duroplast planta Puebla.)
  • Design the automatic sequence of mixers for food products plant (2003, Sabormex, Puebla.)
  • Upgrade of ceramic oven (2003, LAMOSA Revestimientos, Tlaxcala.)
  • Installation and electrical wiring of 6 mechanical presses (2004, GESTAMP, Puebla.)
  • Installation of robot welding machines (2004, GESTAMP, Puebla.)
  • Installation of transport for PT CruisieriInstrument panel assembly line. (2004, Faurecia Duroplast, Puebla.)
  • Design of system for tracking and identify containers and production sequence RFID based. (2006, Faurecia Duroplast, Puebla.)
  • Technical assistance on test and startup of azimuth and elevation motors of the INAOE GTM (2006,GC and MT Aerospace)
  • Technical assistance for getting factory settings in press line, Magna Stampings  (2008, Saltillo, Coah.)
  • Refurbish of MOTAN plastic material drying system, Plastic Omnium, Puebla Plant
  • Hybrid CIP system automation for cleaning and sanitizing 7 bottling lines at Coca Cola ARCA facilities in Guad